
PPAP, PFMEA, process flow and control plan
The documents automotive and industrial OEMs need to approve a new supplier, prepared and maintained for you.

Magnus Sourcing prepares production part approval process (PPAP) submissions at Levels 1 to 5 for parts made by our Indian suppliers, including process flow diagram (PFD), process FMEA, control plan, dimensional and material results, measurement system analysis (MSA), initial process capability (Cpk) and the part submission warrant (PSW).
| PPAP levels | 1 to 5 (AIAG PPAP 4th edition) |
|---|---|
| Core documents | PFD, PFMEA, control plan, PSW |
| Studies | MSA (gauge R&R), Cpk/Ppk on critical characteristics |
| Formats | AIAG, VDA, or customer-specific |
Typical ranges across our supplier network. Final values depend on part geometry, alloy and volume, and are confirmed on your drawing.
What each document does
- Process flow diagram (PFD): every step from raw material to dispatch.
- PFMEA: what can go wrong at each step, how bad it would be and how it is prevented or detected.
- Control plan: what is checked, how, how often and by whom, for each characteristic.
- MSA: evidence that the gauges used are capable of measuring the tolerance.
- PSW: the signed warrant that the part meets all requirements.
Keep exploring


